Today is
Site Characterization and Restoration
Soil and Groundwater Sampling
Environmental Assessment:
Phase I, II and III
Modeling of Contaminating Plumes
Human Health Risk Analysis
Ecosystem Risk Analysis
Design of the Restoration Process
Soil and Groundwater Restoration
Mining and Engineering
Planning and Permitting
Environmental Department Management
Tailings dams design
Design of Heap Leaching Facilities
Engineering of the Closing Down of Operations
Inspection and Supervision of Mining Works
Environmental Impact
Studies Aimed at the Description of the Environmental Baseline
Preventive Reports
Environmental Impact Statements
Permitting
Compliance with Constraints
Risk Analyses of all Kinds
Geohydrology and Soil Mechanics
Central Mine Equipment 55 (CME 55) (Hollow-Stem Helicoidal Auger)
Power Probe 9630 GAS (Hollow-Stem Helicoidal Auger and Direct Push)
Power Probe 9100 VTR (Direct Push)
Little White Wagon (Direct Push)
Accredited Environmental Laboratory
Air
Wastewater
Hazardous Waste
Working Environment
Soil and Groundwater
Health and Safety in the Workplace
Compliance Audit
Design of Action Plan
Compliance Budget
Corrective Actions
Negotiation with Authorities
© Copyright 2008 | Corporación Ambiental de México, S.A. de C.V.